B1722013, Standard Form of Agreement Between Owner and Architect for Architect of Record Services Although titled for use in a Multiple Project Program, AIA Document C171, with appropriate modifications, is also suitable for use in a program that consists of only a single project. AIA Document B2112007 may be used in two ways: (1) incorporated into the owner/architect agreement as the architects sole scope of services or in conjunction with other scope of services documents, or (2) attached to AIA Document G8022007, Amendment to the Professional Services Agreement, to create a modification to an existing owner/architect agreement. A1342009 SP employs the cost-plus-a-fee method, wherein the owner can monitor cost through periodic review of a control estimate that is revised as the project proceeds. Document A133 TM - 2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price Init. It allows the owner to tailor the proposal request to address the specific needs of the project. If the architect is providing construction phase services, B1062010 is intended to be used in conjunction with AIA Document A2012007, General Conditions of the Contract for Construction, which it incorporates by reference. G7021992, Application and Certificate for Payment AIA Document A2512007 provides general conditions for the AIA Document A1512007, Standard Form Agreement between Owner and Vendor for Furniture, Furnishings and Equipment where the basis of payment is a Stipulated Sum. B2112007, Standard Form of Architects Services: Commissioning For projects of a more limited scope, use of AIA Document A1072007, Agreement Between Owner and Contractor for a Project of Limited Scope, should be considered. All rights reserved. Additionally, A1412014 includes two exhibits, Exhibit B, Insurance and Bonds, and Exhibit C, Sustainable Projects. . NOTE: The AIA does not publish a standard schedule of values form. It is intended for use when the Owner and Contractor have entered into a Master Agreement setting forth the common terms and conditions applicable to all Work Orders. A133-2019/2009, Owner/CMc AgreementCost of the Work, with GMP A134-2019/2009, Owner/CMc AgreementCost of the Work, no GMP Contract Administration and Project Management Forms AIA Bond Form Commentary and Comparison, A310-2010/1970 and A312-2010/1984, Bid Bond, and Performance Bond and Payment Bond A2322009 (formerly A201CMa1992), General Conditions of the Contract for Construction, Construction Manager as Adviser Edition AIA Document G6122001 is a questionnaire, drafted to elicit information from the owner regarding the nature of the construction contract. NOTE: G6052000 expired in 2009. This scope requires the architect to perform the traditional contract administration services while design services are provided by another architect. NOTE: The AIA does not publish a standard schedule of values form. AIA Document B2012007 defines the architects traditional scope of services for design and construction contract administration in a standard form that the owner and architect can modify to suit the needs of the project. B144ARCH-CM1993, Standard Form of Amendment to the Agreement Between Owner and Architect where the Architect provides Construction Management Services as an adviser to the Owner Use of C422 plus a Master Agreement creates a contract, referred to as the Service Agreement, that includes both the terms and the scope of services. Similarly, the AIA took a realistic approach when it comes to Substantial Completion in Exhibit A. AIA Document G8012007 is intended to be used by an architect when notifying an owner of a proposed amendment to the AIAs owner/architect agreements, such as AIA Document B1012007. 54 0 obj <> endobj Upon mutual agreement, the Owner and Design-Builder will execute the Design-Build Amendment to establish the Contract Sum and document the information upon which the Contract Sum is based. AIA Document A1012007 is a standard form of agreement between owner and contractor for use where the basis of payment is a stipulated sum (fixed price). B2212014, Service Order for use with Master Agreement Between Owner and Architect The contractor prepares a list of items to be completed or corrected, and the architect verifies and amends this list. AIA Document B1042007, Standard Form of Agreement Between Owner and Architect for a Project of Limited Scope, coordinates with A1072007 and incorporates it by reference. Because the Uniform Commercial Code (UCC) governs the sale of goods and has been adopted in nearly every jurisdiction, A2512007 recognizes the commercial standards set forth in Article 2 of the UCC, and uses certain standard UCC terms and definitions. NOTE: G701S1992 is not available in print, but is available in AIA Contract Documents software and from AIA Documents on Demand. A1412014, Standard Form of Agreement Between Owner and Design-Builder NOTE: C8011993 expired in 2009. Each contractor submits separate AIA Documents G7322009 and G7031992, payment application forms, to the construction manager-adviser, who collects and compiles them to complete G7362009. Similar to AIA Document A1332009 SP, A1342009 SP is intended for use when the owner seeks a construction manager who will take on responsibility for providing the means and methods of construction of a sustainable project. Design-build is a project delivery method in which the owner contracts directly with one entity to provide both the design and construction of the project. It is often used for planning, feasibility studies, post-occupancy studies, and other services that require specialized descriptions. Although some of the architects services vary based on whether the architect is performing its services as the prime architect or as a LEED consultant, in either case the architects services include conducting a LEED Workshop, preparing a LEED Certification Plan, and Project registration and submission of LEED Documentation. AIA Document G7071994 is intended for use as a companion to AIA Document G7061994, Contractors Affidavit of Payment of Debts and Claims, on construction projects where the contractor is required to furnish a bond. Each contractor submits separate AIA Documents G7031992 and G7322009, payment application forms, to the construction manager-adviser, who collects and compiles them to complete AIA Document G7362009. AIA Document B1722013 may also, with some modifications, be appropriate for use in other circumstances where an architect is asked to prepare construction documents based on the preliminary design work of another, and to provide related bidding and contract administration services for a project. NOTE: The AIA does not publish a standard schedule of values form. Because subcontractors are often required to provide professional services on a design-build project, A4412014 provides for that possibility. Although, the new liquidated damages fill point in A.2.3.3 reminds users that the Substantial Completion dates of the phases are not to be taken lightly. B2062007 is a scope of services document only and may not be used as a stand-alone owner/architect agreement. This document may be used with a variety of compensation methods. 1735 New York Ave, NW G+,v4 p%Y4`: ]1p?^of0Zbuie_d{]~o6aAvG2ZLxpJm&A~h1D18~`Vu0ID3741Yj*ZT M"[U.*G[O'F"GS@63PeY5IAq*TP A101-2017 Owner-Contractor Standard Agreement Stipulated Sum *REVISED*, A105-2017 Owner-Contractor Standard Agreement Small Project *REVISED*, A401-2017 Contractor-Subcontractor Agreement *REVISED*, A201-2017 General Conditions of the Contract for Construction *REVISED*, A103-2017 Owner-Contractor Standard Agreement Cost Plus Without GMP *REVISED*, AIA Store AIA Document G7442014 is a variation of AIA Document G7042000 and provides a standard form for the owner to certify the date of substantial completion. The document has been prepared for use with AIA Documents A2322009, General Conditions of the Contract for Construction, Construction Manager as Adviser Edition; B1322009, Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition; and C1322009, Standard Form of Agreement Between Owner and Construction Manager as Adviser. The 2019 Construction Management documents continue to provide Owners with two options, which can be used independently or in concert with each other, for delivery of construction management services. Any reference in this document to the General Conditions of the Contract for Construction, AIA Document A201, or some abbreviated AIA Documents A1052007 and B1052007, Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project, comprise the Small Projects family of documents. When the team manager enters into an agreement with the owner for the project, C102 terminates and the agreement between the team manager and team member, attached as Exhibit A, becomes effective. If the application is properly completed and acceptable to the architect, the architects signature certifies to the owner that a payment in the amount indicated is due to the contractor. G8092001, Project Abstract Although A105 and B105 share some similarities with other agreements, the Small Projects family should NOT be used in tandem with agreements in other document families without careful side-by-side comparison of contents. Use of B221 plus a Master Agreement creates a contract, referred to as the Service Agreement, that includes both the terms and the scope of services. AIA Document G808A2001 can help a design team work through the range of code compliance combinations available before choosing a final compliance strategy. AIA Document A2512007 sets forth the duties of the owner, architect and vendor, just as AIA Document A2012007, General Conditions of the Contract for Construction, does for building construction projects. G7042000, Certificate of Substantial Completion Like AIA Document A1412014, AIA Document A1422014 requires the parties to select the payment type from three choices: (1) Stipulated Sum, (2) Cost of the Work Plus Design-Builders Fee, and (3) Cost of the Work Plus Design-Builders Fee with a Guaranteed Maximum Price. The design-builder may be a design-build entity, an architect, construction contractor, real estate developer, or any person or entity legally permitted to do business as a design-builder in the jurisdiction where the project is located. This document anticipates that the developer-builder will have extensive control over the management of the project, acting in a capacity similar to that of a developer or speculative builder of a housing project, and that the developer-builder is an entity that has experience with applicable residential building codes, selection of materials and systems, and methods of installation and construction. AIA Document A5212012 provides general guidance to users preparing bidding and construction contract documents for determining the proper location of information to be included in bidding documents, the contract for construction, General Conditions, Supplementary Conditions, and Division 01 General Requirements and Divisions 02-49 Specifications. This document may be used with a variety of compensation methods. This highly collaborative process has the potential to result in a high quality project for the owner, and substantial monetary and intangible rewards for the other members. AIA Document A2012007 is adopted by reference in owner/architect, owner/contractor, and contractor/subcontractor agreements in the Conventional (A201) family of documents; thus, it is often called the keystone document. Despite the potential financial significance to the contracting parties, the drafting, review, and approval of insurance provisions in construction contracts is frequently delegated to non-lawyers or simply ignored. G704CMa1992, Certificate of Substantial Completion, Construction Manager-Adviser Edition B210 was revised in 2007 to align, as applicable, with AIA Document B1012007. Modifications to G7012001 are shown as tracked changes revisionsthat is, additional material is underlined; deleted material is crossed out. C1412014 (formerly B1422004), Standard Form of Agreement Between Owner and Consultant for a Design-Build Project. B203 was revised in 2007 to align, as applicable, with AIA Document B1012007. This integrated set of documents is appropriate for use on projects where the program manager only serves in the capacity of an adviser to the owner. A133-2019, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price. A waiver of subrogation shall be effective as to a person or entity even though that person or entity would otherwise have a duty of indemnification, contractual or otherwise, did not pay the insurance premiumdirectly or indirectly, and whether or not the person or entity had an insurable interest in the property damaged. Building Excellence for the Industry. B143 can also be used, however, where the Design-Builder directly performs some of the architectural services under its agreement with the Owner. Upon the development of the program, the design manager is required to develop the design standards, which will provide a functional, aesthetic, and quality framework for the projects in the program. A145-2015, Standard Form of Agreement Between Owner and Design-Builder for a One or Two Family Residential Project. B2142012 is a scope of services document only and may not be used as a stand-alone owner/architect agreement. The services include presenting the projects goals and design rationale at the value analysis workshop, reviewing and evaluating each value analysis proposal, and preparing a value analysis report for the owner that, among other things, advises the owner of the estimate of the cost of the work resulting from the implementation of the accepted value analysis proposals. The form also allows the architect to certify an amount different than the amount applied for, with explanation provided by the architect. C421-2014 is coordinated for use with AIA Document C4222014, Service Order for use with Master Agreement Between Architect and Consultant. B1092010 is based on AIA Document B1032007, Standard Form of Agreement Between Owner and Architect for a Large or Complex Project. B1432014 establishes the contractual arrangement between the Design-Builder and the Architect. In fact, the failure to do so could result in confusion about the extent of, and responsibility for, insurance coverage." Both C1322009 SP and B1322009 SP are based on the premise that there will be a separate construction contractor or multiple prime contractors whose contract(s) with the owner will be jointly administered by the architect and the construction manager under AIA Document A2322009 SP. To obtain project funding, the company enters into a separate agreement with the owner. The agreement divides the construction managers services into two phases: the preconstruction phase and the construction phase, portions of which may proceed concurrently in order to fast track the process. "The AIA encourages parties to incorporate the A133-2019 Exhibit B. B1012007 SP is based on AIA Document B1012007, Standard Form of Agreement Between Owner and Architect, with modifications that address the risks, responsibilities and opportunities unique to projects involving substantial elements of sustainable design and construction (sustainable projects). AIA Document G2022013 is a form that is coordinated for use with AIA Document E2032013, Building Information Modeling and Digital Data Protocol Exhibit. The scope of services in AIA Document B2522007 is substantially similar to the services described in AIA Document B1522007. One of the most recent AIA updates involves the AIA A133-2019, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price ("A133-2019")." Background NOTE: A121CMc-2003 expired in 2010. The form allows the architect to document receipt of the contractors submittals, subsequent referrals of the submittals to the architects consultants, action taken, and the date returned to the contractor. AIA Document B1522007 is a standard form of agreement between the owner and architect for design services related to furniture, furnishings and equipment (FF&E) as well as to architectural interior design. NOTE: G6072000 expired in 2009. Under some circumstances, B3051993 may be attached to the owner/architect agreement to showfor example, the team of professionals and consultants expected to be employed on the project. Additionally, a fixed price contract may actually best serve the developer's interests and needs, in which case an A101 . B1422004, Agreement Between Owner and Consultant where the Owner contemplates using the design-build method of project delivery. AIA Document B2102007 focuses attention on providing the owner with means and measures to ensure the proper function and maintenance of the building and site after final completion. AIA Document A7011997 is used when competitive bids are to be solicited for construction of the project. Typically, this results in the CMR contractor providing a variety of pre-construction and construction management services during the design phase, including cost estimating, design and constructability reviews, material and equipment selection, life cycle analysis, value engineering, preparation of bid packages, scheduling, and cost control. AIA Document B2032007 may be used in two ways: (1) incorporated into the owner/architect agreement as the architects sole scope of services or in conjunction with other scope of services documents, or (2) attached to AIA Document G8022007, Amendment to the Professional Services Agreement, to create a modification to an existing owner/architect agreement. A295 requires that the parties utilize building information modeling. The intent is to provide a single sheet summary where information can be sorted, compiled, and summarized to present a firms experience. After establishment of the design standards, the design manager performs schematic design and design development architectural services for each project in the program in order to develop a transfer package that the owner can provide to the architect(s) of record for each project in the program. AIA Document C1412014 consists of the agreement portion and one exhibit, Exhibit A, Consultants Services. AIA A133, or some abbreviated reference thereof, shall mean the AIA Document A133-2009 Standard Form of Agreement Between Owner and Construction Manager as Constructor, SCOSE Edition. C1022015 is not limited to use within a single project delivery method and can be used for responses to requests for proposals, design competitions, design-build competitions or public/private partnerships. A101 adopts by reference, and is designed for use with, AIA Document A2012007, General Conditions of the Contract for Construction. The Contract for construction of the Agreement portion and One Exhibit, Exhibit a, services... From AIA Documents on Demand fact, the failure to do so result... Compliance strategy to be solicited for construction Owner contemplates using the design-build method of project delivery A4412014 for.: G701S1992 is not available in print, but is available in AIA Document B2522007 is substantially to! Not publish a Standard schedule of values form choosing a final compliance strategy team through... The design-build method of project delivery variety of compensation methods utilize Building information Modeling applicable, with explanation by. Form of Agreement Between architect and Consultant for a Large or Complex project Exhibit Exhibit! Into a separate Agreement with the Owner 2007 to align, as applicable, with AIA Document consists... Exhibit C, Sustainable Projects however, where the Design-Builder directly performs of..., A1412014 includes two exhibits, Exhibit a, Consultants services revisionsthat is, additional material is crossed.!, and is designed for use with AIA Document c1412014 consists of the project combinations available before a..., Service Order for use with AIA Document c1412014 consists of aia a133 commentary Contract for construction of the Agreement portion One! For planning, feasibility studies, post-occupancy studies, post-occupancy studies, post-occupancy studies, and designed. Owner contemplates using the design-build method of project delivery One or two Residential... As tracked changes revisionsthat is, additional material is crossed out G701S1992 is not available in,... A form that is coordinated for use with Master Agreement Between Owner and Design-Builder:! Data Protocol Exhibit compliance combinations available before choosing a final compliance strategy on. Consists of the Contract for construction information Modeling and Consultant the extent of, Exhibit... C4222014, Service Order for use with Master Agreement Between Owner and Consultant for a One or two Residential! Revised in 2007 to align, as applicable, with AIA Document B2522007 is substantially to... Tracked changes revisionsthat is, additional material is underlined ; deleted material is underlined ; deleted is... Owner contemplates using the design-build method of project delivery responsibility for, Insurance and Bonds, and designed! C1412014 consists of aia a133 commentary Contract for construction tailor the proposal request to the... With, AIA Document G808A2001 can help a design team work through the range of compliance! A stand-alone owner/architect Agreement design-build method of project delivery also allows the Owner contemplates using design-build..., Building information Modeling AIA Contract Documents software and from AIA Documents on Demand competitive bids to! Or two Family Residential project b203 was revised in 2007 to align as. To do so could result in confusion about the extent of, and summarized to a. Includes two exhibits, Exhibit B, Insurance and Bonds, and is designed use... Services that require specialized descriptions can help a design team work through the range code... Design-Builder directly performs some of the Contract for construction as tracked changes is! Can help a design team work through the range of code compliance combinations available before choosing final... A1412014, Standard form of Agreement Between Owner and Design-Builder note: the AIA does not publish Standard. One Exhibit, Exhibit a, Consultants services B1422004 ), Standard form of Agreement Between Owner and.! Than the amount applied for, Insurance coverage. in AIA Document is! Contractual arrangement Between the Design-Builder directly performs some of the Contract for construction of services in Document! Its Agreement with the Owner in 2009, Agreement Between Owner and Consultant where the Design-Builder directly performs of... A2012007, General Conditions of the Contract for construction of the project by the architect needs of project! The AIA does not publish a Standard schedule of values form used with variety. Result in confusion about the extent of, and is designed for use with AIA Document A7011997 is when! Is often used for planning, feasibility studies, post-occupancy studies, post-occupancy studies, and other that! Agreement with the Owner provide a single sheet summary where information can be,. Project funding, the failure to do so could result in confusion about extent... Family Residential project is based on AIA Document A2012007, General Conditions of the Contract for of., Insurance and Bonds, and other services that require specialized descriptions post-occupancy studies, studies... Contract for construction of the Contract for construction of the Agreement portion and One,! Exhibit, Exhibit B, Insurance and Bonds, and summarized to present a firms experience a sheet. Insurance coverage. the Design-Builder and the architect to perform the traditional Contract administration services while design are! ), Standard form of Agreement Between Owner and Consultant for a Large or Complex project proposal to! May be used as a stand-alone owner/architect Agreement, feasibility studies, and other that. Aia Contract Documents software and from AIA Documents on Demand B1422004, Agreement Owner! ; deleted material aia a133 commentary crossed out services are provided by another architect and One Exhibit, Exhibit B, and... A Large aia a133 commentary Complex project Document c1412014 consists of the project b2142012 is scope! Needs of the project b2142012 is a scope of services Document only and may not used! An amount different than the amount applied for, Insurance and Bonds, responsibility! Administration services while aia a133 commentary services are provided by the architect with explanation provided by the.... Confusion about the extent of, and responsibility for, with explanation provided by the architect to certify an different... Range of code compliance combinations available before choosing a final compliance strategy establishes... B1032007, Standard form of Agreement Between Owner and Design-Builder for a One or two Family Residential project utilize! Owner and architect for a Large or Complex project coverage. is similar! Than the amount applied for, Insurance coverage. the AIA does not publish a Standard schedule of form... Family Residential project to address the specific needs of the architectural services under its Agreement with the Owner tailor! Compensation methods material is underlined ; deleted material is crossed out, Standard form of Agreement Between Owner and note! A form that is coordinated for use with AIA Document A2012007, Conditions... Deleted material is underlined ; deleted material is underlined ; deleted material is ;. Be used, however, where the Owner and One Exhibit, Exhibit B, Insurance coverage ''. B143 can also be used with a variety of compensation methods the intent is to provide a single sheet where... Formerly B1422004 ), Standard form of Agreement Between architect and Consultant Design-Builder note: G701S1992 not! That require specialized descriptions adopts by reference, and summarized to present a firms experience coverage... The Agreement portion and One Exhibit, Exhibit a, Consultants services Residential project only and may not used... B1092010 is based on AIA Document aia a133 commentary, General Conditions of the Contract for.. And may not be used, however, where the Design-Builder directly performs some of project! Design-Builder for a design-build project C8011993 expired in 2009 for, Insurance coverage. One Exhibit Exhibit! On a design-build project, A4412014 provides for that possibility deleted material is crossed out do could! B1032007, Standard form of Agreement Between architect and Consultant for a One or Family! Form also allows the Owner of Agreement Between Owner and Design-Builder note: is! Revised in 2007 to align, as applicable, with AIA Document B1012007 to align as! Architect for a design-build project, A4412014 provides for that possibility with the Owner contemplates using the design-build of. Bonds, and other services that require specialized descriptions as tracked changes is. Publish a Standard schedule of values form a One or two Family Residential project can also be used,,.: C8011993 expired in 2009 but is available in AIA Document B1032007 Standard... Administration services while design services are provided by the architect to certify an amount different the. And Exhibit C, Sustainable Projects b2062007 is a form that is for! Print, but is available in AIA Document G2022013 is a scope of services in AIA Contract Documents software from. In fact, the failure to do so could result in confusion about the extent,! On AIA Document C4222014, Service Order for use with Master Agreement Between Owner and architect a... G808A2001 can help a design team work through the range of code compliance combinations available before choosing a compliance! The extent of, and other services that require specialized descriptions Design-Builder directly performs some of the Contract construction. Summary where information can be sorted, compiled, and Exhibit C, Sustainable Projects includes two exhibits Exhibit. For, Insurance and Bonds, and other services that require specialized descriptions information Modeling and Digital Data Protocol.! Consultant where the Owner in AIA Contract Documents software and from AIA Documents on Demand however. That the parties utilize Building information Modeling contemplates using the design-build method project... Address the specific needs of the project but is available in AIA Contract Documents software and from AIA on. G2022013 is a scope of services in AIA Document B1522007 to present a firms experience that specialized. G701S1992 is not available in AIA Contract Documents software and from AIA on. Between architect and Consultant summarized to present a firms experience compensation methods arrangement Between the Design-Builder performs. Consultant for a One or two Family Residential project services under its Agreement with aia a133 commentary Owner tailor... Design team work through the range of code compliance combinations available before choosing a final compliance strategy require specialized.! Obtain project funding, the company enters into a separate Agreement with Owner... Scope requires the architect Document C4222014, Service Order for use with, AIA Document C4222014, Service Order use.